IMO/VIN
Callsign
Flag
Service
Year
9385673
LADV7
NORWAY
Tank Ship
2009
Activity#
Port
Date
Activity - Description
Deficiencies
7329447
CORPUS CHRISTI, Texas
Oct 09, 21
Vessel Inspection - Agency Action Complete
7262136
CORPUS CHRISTI, Texas
Jul 27, 21
Vessel Inspection - Approved Inspection
1
1
System Subsystem Cause 09 - Working and Living Conditions 092 - Working Conditions
Description Due Date Resolved A master gas fuel valve that can be closed from within the machinery space should be provided within the cargo area. PSCO discovered 4 master gas valves(CG946, CG947, CG948, CG949) aft of cargo area; aft of house and aft of stack. Master gas valve location needs to conform with electrical safety requirements, ventilation distance requirements, and deck water spray requirements.
SOLAS 74(cons '14)VII/13.1
93' IGC 16.3.7 Jul 26, 21 Yes
Resolved Date Resolution Oct 08, 21 Vessel provided class report attesting to survey of electrical and ventilation near affected gas valves.
System Subsystem Cause 09 - Working and Living Conditions 092 - Working Conditions Improper/Lack of Maintenance
Description Due Date Resolved Electrical equipment, cables and wiring should not be installed in hazardous locations unless it conforms with the standards not inferior to those acceptable the organization. PSCO discovered numerous bonding wires for temperature sensors and lighting throughout the cargo deck area.
SOLAS 74(cons '14)VII/13.1
IGC '93 10.1.4 Jul 26, 21 No
7264566
CORPUS CHRISTI, Texas
Jul 26, 21
Boarding - Agency Action Complete
7265452
CORPUS CHRISTI, Texas
Jul 23, 21
Vessel Operational Control - Agency Action Complete
6951872
TEXAS CITY, Texas
May 11, 20
Vessel Inspection - Agency Action Complete
6917791
Lake Charles, Louisiana
Feb 28, 20
Vessel Inspection - Approved Inspection
5772011
BOSTON, Massachusetts
Nov 25, 15
Vessel Transfer Monitor - Approved Inspection
5762808
BOSTON, Massachusetts
Nov 13, 15
Vessel Inspection - Approved Inspection
5057671
BOSTON, Massachusetts
Jan 26, 15
Vessel Inspection - Approved Inspection
5050632
BOSTON, Massachusetts
Jan 08, 15
Vessel Transfer Monitor - Approved Inspection
5049602
BOSTON, Massachusetts
Jan 08, 15
Vessel Inspection - Approved Inspection
4933486
BOSTON, Massachusetts
Jul 22, 14
Vessel Transfer Monitor - Approved Inspection
4929323
BOSTON, Massachusetts
Jul 22, 14
Vessel Inspection - Approved Inspection
4906413
TEXAS CITY, Texas
Jun 30, 14
Vessel Inspection - Approved Inspection
4790880
BOSTON, Massachusetts
Jan 25, 14
Vessel Transfer Monitor - Approved Inspection
4785564
BOSTON, Massachusetts
Jan 20, 14
Vessel Inspection - Approved Inspection
4740340
BOSTON, Massachusetts
Oct 25, 13
Vessel Inspection - Approved Inspection
4700831
BOSTON, Massachusetts
Sep 04, 13
Vessel Inspection - Approved Inspection
4689760
BOSTON, Massachusetts
Aug 20, 13
Vessel Inspection - Approved Inspection
4638971
BOSTON, Massachusetts
Jul 02, 13
Vessel Inspection - Approved Inspection
4598564
BOSTON, Massachusetts
May 23, 13
Vessel Inspection - Agency Action Complete
4585467
BOSTON, Massachusetts
May 06, 13
Vessel Inspection - Approved Inspection
1
0
System Subsystem Cause Engineering Thrusters
Description Due Date Resolved 1300-Mooring Arrangements- After any survey under regulation 7,8,9,10 has been completed, no change shall be made in construction, machinery, equipment and other items covered by survey without sanction of the administration. #4 aft thruster motor is inoperable, electrical motor is burnt out. Cite: SOLAS 09 Cons Chap 1/11. Jun 07, 14 Yes
Resolved Date Resolution Jun 30, 14 Recieved satisfacatory class report attesting to requirement of 1 bow and 1 stern thruster. Vessel is equipped with 2 bow and 2 stern thrusters. Vessel remains fit for operations.
4523841
Ponce, Puerto Rico
Feb 01, 13
Vessel Inspection - Approved Inspection
4469278
BOSTON, Massachusetts
Oct 23, 12
Vessel Inspection - Approved Inspection
4455930
Port Arthur, Texas
Oct 03, 12
Vessel Inspection - Agency Action Complete
4446781
BOSTON, Massachusetts
Sep 21, 12
Vessel Inspection - Approved Inspection
4423213
BOSTON, Massachusetts
Aug 31, 12
Vessel Inspection - Approved Inspection
4406202
Houston, Texas
Aug 09, 12
Vessel Operational Control - Agency Action Complete
4392213
BOSTON, Massachusetts
Jul 31, 12
Vessel Inspection - Approved Inspection
4380802
BOSTON, Massachusetts
Jul 17, 12
Vessel Inspection - Agency Action Complete
4355773
BOSTON, Massachusetts
Jun 21, 12
Vessel Inspection - Agency Action Complete
4272826
BOSTON, Massachusetts
Mar 23, 12
Vessel Inspection - Agency Action Complete
4236569
BOSTON, Massachusetts
Feb 07, 12
Vessel Inspection - Agency Action Complete
1
0
System Subsystem Cause Deck/Cargo Cargo Transfer/Lightering (liquid) Improper/Lack of Maintenance
Description Due Date Resolved The condition of the ship and it's equipment shall be maintained to conform with the provisions of the present regulations to ensure that the ship in all respects will remain fit to proceed to sea without danger to the ship or persons on board. The ships number one low duty compressor motor is inoperable. Feb 14, 12 Yes
Resolved Date Resolution Mar 23, 12 The number one low duty compressor was found to be in good working condition by the attending USCG Marine Inspector.
4223472
BOSTON, Massachusetts
Jan 12, 12
Vessel Inspection - Approved Inspection
4159030
BOSTON, Massachusetts
Oct 07, 11
Vessel Inspection - Approved Inspection
4147475
BOSTON, Massachusetts
Sep 20, 11
Vessel Inspection - Approved Inspection
4118573
BOSTON, Massachusetts
Aug 24, 11
Vessel Inspection - Approved Inspection
4016617
BOSTON, Massachusetts
May 21, 11
Vessel Inspection - Agency Action Complete
4000084
BOSTON, Massachusetts
May 02, 11
Vessel Inspection - Agency Action Complete
3989766
BOSTON, Massachusetts
Apr 21, 11
Vessel Inspection - Approved Inspection
3969418
BOSTON, Massachusetts
Mar 24, 11
Vessel Inspection - Agency Action Complete
1
0
System Subsystem Cause Engineering Gasoline Engine (propulsion)
Description Due Date Resolved The Positioner for the air intake for the GCU was not working. Causing the GCU to only work at 50%. Positioner valve was replaced and tested. SAT. Mar 24, 11 Yes
Resolved Date Resolution Mar 24, 11
3956722
BOSTON, Massachusetts
Mar 06, 11
Vessel Inspection - Approved Inspection
3928082
BOSTON, Massachusetts
Jan 14, 11
Vessel Inspection - Agency Action Complete
3924331
BOSTON, Massachusetts
Jan 13, 11
Vessel Inspection - Agency Action Complete
3913819
BOSTON, Massachusetts
Dec 26, 10
Vessel Inspection - Agency Action Complete
3904436
BOSTON, Massachusetts
Dec 05, 10
Vessel Inspection - Agency Action Complete
3893039
BOSTON, Massachusetts
Nov 19, 10
Vessel Inspection - Approved Inspection
3879721
BOSTON, Massachusetts
Oct 28, 10
Vessel Inspection - Agency Action Complete
3857871
BOSTON, Massachusetts
Sep 26, 10
Vessel Inspection - Agency Action Complete
3809345
BOSTON, Massachusetts
Aug 05, 10
Vessel Inspection - Agency Action Complete
1
0
System Subsystem Cause Engineering Steering Gear System
Description Due Date Resolved The main steering gear and auxiliary steering gear shall be so arranged so that the failure of one of them does not render the other inoperative. One motor for the steering pump is inoperable, therefore the vessel cannot swich to auxiliary steering. Class shall attest the proper operation of both steering gear motors prior to the vessel entering port Aug 06, 10 Yes
Resolved Date Resolution Aug 06, 10 CG received class report from class saying that the steering gear is fixed. CG went onboard to verify ALL SAT
3793782
BOSTON, Massachusetts
Jul 16, 10
Vessel Inspection - Approved Inspection
3781135
BOSTON, Massachusetts
Jun 30, 10
Vessel Inspection - Approved Inspection
3767171
BOSTON, Massachusetts
Jun 15, 10
Vessel Inspection - Approved Inspection
3740860
BOSTON, Massachusetts
May 18, 10
Vessel Inspection - Approved Inspection
3725149
BOSTON, Massachusetts
Apr 27, 10
Vessel Inspection - Agency Action Complete
3721559
BOSTON, Massachusetts
Apr 21, 10
Vessel Inspection - Approved Inspection
3710065
BOSTON, Massachusetts
Apr 04, 10
Vessel Inspection - Agency Action Complete
3662595
BOSTON, Massachusetts
Jan 20, 10
Vessel Inspection - Approved Inspection
2
0
System Subsystem Cause Deck/Cargo Cargo Transfer/Lightering (liquid) Improper Installation
Description Due Date Resolved Flange bolf is missing/not tightened above the inboard hi-duty compressor. Ensure flange bolt is properly installed. Rectify prior to movement to the satisfaction of the USCG. Yes
Resolved Date Resolution Jan 22, 10 Deficiency Rectified by the DMI.
System Subsystem Cause Electrical Electrical Distribution System (service) Improper Installation
Description Due Date Resolved Several flange connections within the compressor room are missing electrical bonding straps. Check all connections within compressor room and apply electrical bonding straps where necessary. Rectif prior to movement to the satisfaction of the USCG. Yes
Resolved Date Resolution Jan 22, 10 Deficiency Rectified by the DMI.
Documents
Issued
Expires
Agency
Certificate of Compliance - Tank Vessel
January 20,2014
January 20,2016
USCG
Certificate of Fitness - Gas Carrier
September 22,2019
November 30,2024
DNV
Classification Document
April 11,2015
November 30,2019
DNV
International Load Line Certificate
September 22,2019
November 30,2024
DNV
International Oil Pollution Prevention Certificate
December 16,2011
November 30,2014
DNV
ISM - Document Of Compliance
March 14,2011
March 13,2016
DNV
ISM - Safety Management Certificate
May 12,2010
October 12,2010
DNV
Minimum Safe Manning Document
October 20,2009
NO
SOLAS Cargo Ship Safety Construction Certificate
September 22,2019
November 30,2024
DNV
SOLAS Cargo Ship Safety Equipment Certificate
September 22,2019
November 30,2024
DNV
SOLAS Cargo Ship Safety Radio Certificate
September 22,2019
November 30,2024
DNV
Subchapter O Endorsement
March 5,2020
March 5,2022
N/A
Tonnage Certificate, International
August 3,2009
DNV