Arctic Flounder
Print Q88   
IMO/VIN Callsign Flag Service Year
9332638 V7RJ8 MARSHALL ISLANDS Tank Ship 2009
Activity# Port Date Activity - Description Deficiencies
7536030 New Orleans, Louisiana Aug 24, 22 Vessel Inspection - Approved Inspection
  3
SystemSubsystemCause
07 - Fire SafetyN/A - No SubsystemInvalid
DescriptionDue DateResolved
For this purpose, the following functional requirements shall be met: means shall be provided to control leaks of flammable liquids. PSCO observed fuel oil leak on the pressure gauge of fuel oil supply to the IGG burner. Vessel must rectify prior to cargo operations that require inert gas. 74 SOLAS (2009) II-2/4.1.1 Code: acAug 24, 22Yes
Resolved DateResolution
Aug 25, 22Received, reviewed and accepted class report / proper documentation from DNV stating the deficiency was rectified. Supply fitting to solenoid valve was replaced along with supply line O-ring. New fitting and valve tested satisfactorily.
SystemSubsystemCause
07 - Fire SafetyN/A - No Subsystem
DescriptionDue DateResolved
The inert gas system referred to in chapter II-2 of the Convention shall be designed, constructed and tested to the satisfaction of the Administration. It shall be so designed and operated as to render and maintain the atmosphere of cargo tanks non-flammable at all times, except when such tanks are required to be gas-free. PSCO observed the capacity valve for the IGG is only able to operate manually when it is designed to operate automatically. Vessel must fix prior to cargo operations that require inert gas. 74 SOLAS(2004) II-2/4.5.5.1 Code: ac FSS Code 15.2.1.2Aug 24, 22Yes
Resolved DateResolution
Aug 25, 22Received, reviewed and accepted class report from DNV stating the deficiency was rectified. Control capacity valve was disassembled. All valve springs and rings were renewed and valve tested satisfactorily under class attandance.
SystemSubsystemCause
02 - Structural ConditionsN/A - No Subsystem
DescriptionDue DateResolved
The machinery, boilers, and other pressure vessels, associated piping systems and fittings shall be of a design and construction adequate for the service for which they are intended and shall be so installed and protected as to reduce to a minimum any danger to persons on board, due regard being paid to moving parts, hot surfaces and other hazards. PSCO identified a hydraulic leak on the #1 steering gear. 74 SOLAS (2009) II-1/29.1 Code: 60acAug 24, 22Yes
Resolved DateResolution
Aug 25, 22Received, reviewed and accepted class report from DNV stating the deficiency was rectified. No. 1 steering gear pump suction line from the suction strainer to the valve block was disassembled and all mating surfaces cleaned. System tested satisfactorily.
6980325 STATEN ISLAND, New York Jun 19, 20 Vessel Inspection - Approved Inspection
6982560 STATEN ISLAND, New York Jun 18, 20 Boarding - Agency Action Complete
6972123 STATEN ISLAND, New York Jun 09, 20 Vessel Operational Control - Agency Action Complete
6939372 STATEN ISLAND, New York Apr 15, 20 Vessel Operational Control - Agency Action Complete
6604012 STATEN ISLAND, New York Dec 30, 18 Vessel Inspection - Approved Inspection
6159562 Houston, Texas May 31, 17 Vessel Inspection - Approved Inspection
  1
SystemSubsystemCause
Deck/CargoVapor Control SystemsDamaged By Earlier Event
DescriptionDue DateResolved
1199; Each vesssel vapor connectino flange face must have a permanent stud projecting outward that has a 12.7mm (0.5 inch)diameter and is at least 25.4mm (1 inch) long. It must be located at the top of the flange face midway between bolt holes and in line with bolt hole pattern. Portside manifold vapor line manifold stud wasted. 46 CFR 39.2001(j)May 30, 17Yes
Resolved DateResolution
May 30, 17Vessel crew replaced wasted Vapor mainfold face flange permanenet stud in the presence of USCG PSCO.
6157035 Houston, Texas May 28, 17 Vessel Operational Control - Approved Inspection
4654273 Lewes, Delaware Jul 17, 13 Vessel Inspection - Approved Inspection
Documents Issued Expires Agency
Certificate of Compliance - Tank Vessel May 30,2017 May 30,2019 N/A
Classification Document December 10,2010 April 9,2014 DNV
COC-TVE Renewal May 30,2017 May 30,2019 N/A
International Load Line Certificate May 3,2021 April 9,2024 DNV
International Oil Pollution Prevention Certificate May 3,2021 April 9,2024 DNV
ISM - Document Of Compliance May 1,2013 April 21,2014 N/A
ISM - Safety Management Certificate May 1,2013 September 15,2015 N/A
Minimum Safe Manning Document September 18,2014 MH
SOLAS Cargo Ship Safety Certificate May 3,2021 April 9,2024 DNV
SOLAS Cargo Ship Safety Construction Certificate February 13,2022 April 9,2024 DNV
SOLAS Cargo Ship Safety Equipment Certificate June 1,2010 April 9,2014 DNV
SOLAS Cargo Ship Safety Radio Certificate May 14,2009 April 9,2014 DNV
Tonnage Certificate, International March 4,2009 DNV