Penn 81
Print Q88   
IMO/VIN Callsign Flag Service Year
1231560 UNITED STATES Tank Barge 2011
Activity# Port Date Activity - Description Deficiencies
7379920 New Orleans, Louisiana Jan 13, 22 Vessel Inspection - Approved Inspection
7322274 ST PETERSBURG, Florida Sep 28, 21 Vessel Inspection - Agency Action Complete
7322274 Tampa, Florida Sep 28, 21 Vessel Inspection - Agency Action Complete
7175788 ST PETERSBURG, Florida Apr 16, 21 Vessel Inspection - Approved Inspection
  2
SystemSubsystemCause
05 - Radio CommunicationsN/A - No Subsystem
DescriptionDue DateResolved
Licenses for ship stations in the maritime services will normally be issued for a term of ten years from the date of original issuance, or renewal. License authorization expired in February 2021. 47 CFR 80.25(a)Oct 03, 21Yes
Resolved DateResolution
Sep 03, 21Vessel is not required to have a VFH. 04 handheld radios suffice for primary and back-up comms per the conditional occupancy endorsement.
SystemSubsystemCause
09 - Working and Living Conditions092 - Working Conditions
DescriptionDue DateResolved
The following plans must be submitted for Coast Guard review in 110.25-3: elementary one-line diagram of the power system, supported by cable lists, panel board summaries, and other information. While conducting electrical plan review for the new BWTS, MI found the following distribution panels do not match approved plans: L1-A, L2-A, LB-1B, and LP-1A. Submit electrical drawings to MSC for revision to match new installation. 46 CFR 31.35-1 & 46 CFR 110.25-1Oct 03, 21Yes
Resolved DateResolution
Jan 13, 22Vessel rep provided line diagram and MSC approval letter. Cleared Def. Documents attached.
7175788 Tampa, Florida Apr 16, 21 Vessel Inspection - Approved Inspection
  2
SystemSubsystemCause
05 - Radio CommunicationsN/A - No Subsystem
DescriptionDue DateResolved
Licenses for ship stations in the maritime services will normally be issued for a term of ten years from the date of original issuance, or renewal. License authorization expired in February 2021. 47 CFR 80.25(a)Oct 03, 21Yes
Resolved DateResolution
Sep 03, 21Vessel is not required to have a VFH. 04 handheld radios suffice for primary and back-up comms per the conditional occupancy endorsement.
SystemSubsystemCause
09 - Working and Living Conditions092 - Working Conditions
DescriptionDue DateResolved
The following plans must be submitted for Coast Guard review in 110.25-3: elementary one-line diagram of the power system, supported by cable lists, panel board summaries, and other information. While conducting electrical plan review for the new BWTS, MI found the following distribution panels do not match approved plans: L1-A, L2-A, LB-1B, and LP-1A. Submit electrical drawings to MSC for revision to match new installation. 46 CFR 31.35-1 & 46 CFR 110.25-1Oct 03, 21Yes
Resolved DateResolution
Jan 13, 22Vessel rep provided line diagram and MSC approval letter. Cleared Def. Documents attached.
7166940 ST PETERSBURG, Florida Apr 01, 21 Vessel Inspection - Approved Inspection
7166940 Tampa, Florida Apr 01, 21 Vessel Inspection - Approved Inspection
6961982 New Orleans, Louisiana Jul 17, 20 Vessel Inspection - Approved Inspection
6955773 STATEN ISLAND, New York May 19, 20 Vessel Inspection - Administrative Action
6770401 Houma, Louisiana Aug 02, 19 Vessel Inspection - Approved Inspection
  5
SystemSubsystemCause
13 - Propulsion and Auxiliary MachineryN/A - No Subsystem
DescriptionDue DateResolved
All exposed and dangerous places such as gears and machinery shall be properly protected with covers, guards or rails in order that the danger of accidents may be minimized; Cargo pump prime mover din not have lagging on exhaust; make corrections in accordance with 46CFR32.05-15; to the satisfaction of the Coast Guard; in 14 days.Aug 05, 19Yes
Resolved DateResolution
Aug 05, 19Vsl replaced lagging.
SystemSubsystemCause
06 - Cargo Operations Including EquipmentN/A - No Subsystem
DescriptionDue DateResolved
Each system required by this sub-part to be intrinsically safe must use approved components meeting UL 913 or IEC; Starboard junction box housing of facility connection; make repairs meeting requirements of 46CFR111.105-11, to the satisfaction of the Coast Guard; prior to departure.Aug 05, 19Yes
Resolved DateResolution
Aug 05, 19Vsl repaired juction box wiring.
SystemSubsystemCause
06 - Cargo Operations Including EquipmentN/A - No Subsystem
DescriptionDue DateResolved
Each system required by this sub-part to be intrinsically safe must use approved components meeting UL 913 or IEC; the forward high level and overfill protection monitor display case and fitting were not intrinsically safe; make repairs meeting requirements of 46CFR111.105-11;to the satisfaction of the Coast Guard; prior to departure.Aug 05, 19Yes
Resolved DateResolution
Aug 05, 19Vsl replaces wiring to meet requirments
SystemSubsystemCause
06 - Cargo Operations Including EquipmentN/A - No Subsystem
DescriptionDue DateResolved
Machinery driving forced-draft and induced-draft fans, fuel-oil transfer pumps, fuel oil unit and service pump and similar fuel-oil pump must be fitted with remote controls outside the space; Starboard side cargo pump house, vent and cargo controls were not operational; make repairs according to 46CFR58.01-25; to the satisfaction of the Coast Guard; prior to departure.Aug 05, 19Yes
Resolved DateResolution
Aug 05, 19Vsl replaced contols.
SystemSubsystemCause
13 - Propulsion and Auxiliary MachineryN/A - No Subsystem
DescriptionDue DateResolved
The remote quick acting manual shutdown shall be installed on the engine so as to provide a quick and effective means of stopping the engine; Remote manual shutdowns did not operate freely and secure both #1 and #2 discharge pumps; Correct deficiency prior to movement and to the satisfaction of the Coast Guard.Aug 02, 19Yes
Resolved DateResolution
Aug 06, 19Vsl repaired and replaced emergency shutoff.
6710333 Houma, Louisiana Jun 11, 19 Vessel Inspection - Approved Inspection
6405178 New Orleans, Louisiana May 08, 18 Vessel Inspection - Approved Inspection
6184222 STATEN ISLAND, New York Jun 23, 17 Vessel Inspection - Agency Action Complete
6154567 New Orleans, Louisiana May 31, 17 Vessel Inspection - Approved Inspection
5848463 STATEN ISLAND, New York Apr 06, 16 Vessel Inspection - Agency Action Complete
5129564 ATLANTIC BEACH, North Carolina May 19, 15 Vessel Transfer Monitor - Agency Action Complete
5109055 STATEN ISLAND, New York Apr 23, 15 Vessel Inspection - Approved Inspection
5108677 STATEN ISLAND, New York Apr 22, 15 Vessel Inspection - Agency Action Complete
5108744 STATEN ISLAND, New York Apr 21, 15 Vessel Inspection - Agency Action Complete
5109128 WASHINGTON, District of Columbia Apr 21, 15 Incident Investigation - Agency Action Complete
5066953 STATEN ISLAND, New York Feb 09, 15 Vessel Inspection - Agency Action Complete
  1
SystemSubsystemCause
Construction/LoadlineHull
DescriptionDue DateResolved
In conjunction with vessel's Annual COI inspection and ABS Loadline inspection, vessel shall make permanent repairs to 3ft radius inset on port bow, to include repair of the longitudinals 3 through 5, to the satisfaction of the marine surveyor.May 15, 15Yes
Resolved DateResolution
Apr 22, 15Visually inspected exterior of the repair job, ABS Surveyor inspected interior and witnessed the pressure test to 2 psi. all sat.
5068044 STATEN ISLAND, New York Feb 04, 15 Vessel Inspection - Agency Action Complete
5064493 WASHINGTON, District of Columbia Feb 03, 15 Incident Investigation - Agency Action Complete
4835450 STATEN ISLAND, New York Apr 14, 14 Vessel Inspection - Agency Action Complete
  1
SystemSubsystemCause
ElectricalElectric Supply System (service)
DescriptionDue DateResolved
Starboard side electrical motor winch power feed armored cable is compromised and exposed. Cable needs to be repaired back to original condition as per 46 CFR 111.105-17.May 02, 14Yes
Resolved DateResolution
Apr 30, 14Received report from General Marine Electric LLC attesting to the proper repairs to the electrical motor winch power feed cable located in the hazardous zone.
4652623 BATON ROUGE, Louisiana Jul 11, 13 Vessel Inspection - Approved Inspection
4621716 PHILADELPHIA, Pennsylvania Jun 14, 13 Vessel Inspection - Approved Inspection
  1
SystemSubsystemCause
Deck/CargoVapor Control Systems
DescriptionDue DateResolved
PROVE PROPER OPERATION OF HIGH AND OVERFILL ALARMS PRIOR TO USING VAPOR CONTROL SYSTEM.Jul 14, 13Yes
Resolved DateResolution
Jul 11, 13
4612508 PHILADELPHIA, Pennsylvania Jun 03, 13 Facility Transfer Monitor - Agency Action Complete
4554150 PHILADELPHIA, Pennsylvania Mar 20, 13 Facility Transfer Monitor - Agency Action Complete
4319517 PHILADELPHIA, Pennsylvania May 23, 12 Vessel Inspection - Approved Inspection
  2
SystemSubsystemCause
NavigationCollision/Grounding Avoidance
DescriptionDue DateResolved
Forward anchor light was not operational.Jun 06, 12Yes
Resolved DateResolution
May 25, 12Received evidence of proper operation of forward anchor light.
SystemSubsystemCause
Deck/CargoCargo Heating
DescriptionDue DateResolved
Forward, #1 Thermal fluid heater was not operational. Volcanic tech was onboard attempting repairs. Required tech report after repairs are complete.Jun 06, 12Yes
Resolved DateResolution
Jun 01, 12Received tech report from Volcanic stating the thermal fluid heater was operational and all safety devices in working order.
3991530 New Orleans, Louisiana Apr 27, 11 Vessel Inspection - Approved Inspection
3875060 Louisville, Kentucky Oct 19, 10 Vessel Inspection - Agency Action Complete
  3
SystemSubsystemCause
NavigationCollision/Grounding Avoidance
DescriptionDue DateResolved
Due to the forward mast being removed during transit to New Orleans; while in transit on Inland Rivers a flashing amber light shall be placed on the bow in accordance with navigation rule 24, upon re-installation of forward mast prove proper placement and operation to the attending Class Surveyor or USCG inspector.Yes
Resolved DateResolution
Apr 27, 11Vsl reinstalled forward mast. All lights on mast tested sat.
SystemSubsystemCause
EngineeringSteam Boiler (auxiliary/waste heat)
DescriptionDue DateResolved
Prove proper operation of # 1 Thermal Fluid Heater to the satisfaction of the attending Class Surveyor or USCG Inspector.Yes
Resolved DateResolution
Apr 16, 11Cleared by attending ABS class surveyor
SystemSubsystemCause
Deck/CargoBallast
DescriptionDue DateResolved
Prove proper operation of ballast pump to attending Class Surveyor or USCG Inspector.Yes
Resolved DateResolution
Apr 16, 11Cleared by attending ABS surveyor.
Documents Issued Expires Agency
Cargo Authority Attachment April 12,2011 N/A
CERTIFICATE OF DOCUMENTATION February 8,2022 February 28,2023 USCG
Certificate of Inspection September 1,2021 September 1,2026 USCG
Certificate of Inspection - Amended May 23,2016 May 23,2021 USCG
Classification Document April 15,2011 September 14,2011 ABS
International Load Line Certificate September 3,2021 April 14,2026 ABS
International Oil Pollution Prevention Certificate May 23,2016 May 23,2021 SECNY
Int'l Oil Poll Prevention, Form B Supplement September 3,2021 N/A
Tonnage Certificate, International February 24,2011 ABS