IMO/VIN
Callsign
Flag
Service
Year
1231560
UNITED STATES
Tank Barge
2011
Activity#
Port
Date
Activity - Description
Deficiencies
7379920
New Orleans, Louisiana
Jan 13, 22
Vessel Inspection - Approved Inspection
7322274
ST PETERSBURG, Florida
Sep 28, 21
Vessel Inspection - Agency Action Complete
7322274
Tampa, Florida
Sep 28, 21
Vessel Inspection - Agency Action Complete
7175788
ST PETERSBURG, Florida
Apr 16, 21
Vessel Inspection - Approved Inspection
2
0
System Subsystem Cause 05 - Radio Communications N/A - No Subsystem
Description Due Date Resolved Licenses for ship stations in the maritime services will normally be issued for a term of ten years from the date of original issuance, or renewal.
License authorization expired in February 2021.
47 CFR 80.25(a) Oct 03, 21 Yes
Resolved Date Resolution Sep 03, 21 Vessel is not required to have a VFH. 04 handheld radios suffice for primary and back-up comms per the conditional occupancy endorsement.
System Subsystem Cause 09 - Working and Living Conditions 092 - Working Conditions
Description Due Date Resolved The following plans must be submitted for Coast Guard review in 110.25-3: elementary one-line diagram of the power system, supported by cable lists, panel board summaries, and other information.
While conducting electrical plan review for the new BWTS, MI found the following distribution panels do not match approved plans: L1-A, L2-A, LB-1B, and LP-1A.
Submit electrical drawings to MSC for revision to match new installation.
46 CFR 31.35-1 & 46 CFR 110.25-1 Oct 03, 21 Yes
Resolved Date Resolution Jan 13, 22 Vessel rep provided line diagram and MSC approval letter. Cleared Def. Documents attached.
7175788
Tampa, Florida
Apr 16, 21
Vessel Inspection - Approved Inspection
2
0
System Subsystem Cause 05 - Radio Communications N/A - No Subsystem
Description Due Date Resolved Licenses for ship stations in the maritime services will normally be issued for a term of ten years from the date of original issuance, or renewal.
License authorization expired in February 2021.
47 CFR 80.25(a) Oct 03, 21 Yes
Resolved Date Resolution Sep 03, 21 Vessel is not required to have a VFH. 04 handheld radios suffice for primary and back-up comms per the conditional occupancy endorsement.
System Subsystem Cause 09 - Working and Living Conditions 092 - Working Conditions
Description Due Date Resolved The following plans must be submitted for Coast Guard review in 110.25-3: elementary one-line diagram of the power system, supported by cable lists, panel board summaries, and other information.
While conducting electrical plan review for the new BWTS, MI found the following distribution panels do not match approved plans: L1-A, L2-A, LB-1B, and LP-1A.
Submit electrical drawings to MSC for revision to match new installation.
46 CFR 31.35-1 & 46 CFR 110.25-1 Oct 03, 21 Yes
Resolved Date Resolution Jan 13, 22 Vessel rep provided line diagram and MSC approval letter. Cleared Def. Documents attached.
7166940
ST PETERSBURG, Florida
Apr 01, 21
Vessel Inspection - Approved Inspection
7166940
Tampa, Florida
Apr 01, 21
Vessel Inspection - Approved Inspection
6961982
New Orleans, Louisiana
Jul 17, 20
Vessel Inspection - Approved Inspection
6955773
STATEN ISLAND, New York
May 19, 20
Vessel Inspection - Administrative Action
6770401
Houma, Louisiana
Aug 02, 19
Vessel Inspection - Approved Inspection
5
0
System Subsystem Cause 13 - Propulsion and Auxiliary Machinery N/A - No Subsystem
Description Due Date Resolved All exposed and dangerous places such as gears and machinery shall be properly protected with covers, guards or rails in order that the danger of accidents may be minimized; Cargo pump prime mover din not have lagging on exhaust; make corrections in accordance with 46CFR32.05-15; to the satisfaction of the Coast Guard; in 14 days. Aug 05, 19 Yes
Resolved Date Resolution Aug 05, 19 Vsl replaced lagging.
System Subsystem Cause 06 - Cargo Operations Including Equipment N/A - No Subsystem
Description Due Date Resolved Each system required by this sub-part to be intrinsically safe must use approved components meeting UL 913 or IEC; Starboard junction box housing of facility connection; make repairs meeting requirements of 46CFR111.105-11, to the satisfaction of the Coast Guard; prior to departure. Aug 05, 19 Yes
Resolved Date Resolution Aug 05, 19 Vsl repaired juction box wiring.
System Subsystem Cause 06 - Cargo Operations Including Equipment N/A - No Subsystem
Description Due Date Resolved Each system required by this sub-part to be intrinsically safe must use approved components meeting UL 913 or IEC; the forward high level and overfill protection monitor display case and fitting were not intrinsically safe; make repairs meeting requirements of 46CFR111.105-11;to the satisfaction of the Coast Guard; prior to departure. Aug 05, 19 Yes
Resolved Date Resolution Aug 05, 19 Vsl replaces wiring to meet requirments
System Subsystem Cause 06 - Cargo Operations Including Equipment N/A - No Subsystem
Description Due Date Resolved Machinery driving forced-draft and induced-draft fans, fuel-oil transfer pumps, fuel oil unit and service pump and similar fuel-oil pump must be fitted with remote controls outside the space; Starboard side cargo pump house, vent and cargo controls were not operational; make repairs according to 46CFR58.01-25; to the satisfaction of the Coast Guard; prior to departure. Aug 05, 19 Yes
Resolved Date Resolution Aug 05, 19 Vsl replaced contols.
System Subsystem Cause 13 - Propulsion and Auxiliary Machinery N/A - No Subsystem
Description Due Date Resolved The remote quick acting manual shutdown shall be installed on the engine so as to provide a quick and effective means of stopping the engine; Remote manual shutdowns did not operate freely and secure both #1 and #2 discharge pumps; Correct deficiency prior to movement and to the satisfaction of the Coast Guard. Aug 02, 19 Yes
Resolved Date Resolution Aug 06, 19 Vsl repaired and replaced emergency shutoff.
6710333
Houma, Louisiana
Jun 11, 19
Vessel Inspection - Approved Inspection
6405178
New Orleans, Louisiana
May 08, 18
Vessel Inspection - Approved Inspection
6184222
STATEN ISLAND, New York
Jun 23, 17
Vessel Inspection - Agency Action Complete
6154567
New Orleans, Louisiana
May 31, 17
Vessel Inspection - Approved Inspection
5848463
STATEN ISLAND, New York
Apr 06, 16
Vessel Inspection - Agency Action Complete
5129564
ATLANTIC BEACH, North Carolina
May 19, 15
Vessel Transfer Monitor - Agency Action Complete
5109055
STATEN ISLAND, New York
Apr 23, 15
Vessel Inspection - Approved Inspection
5108677
STATEN ISLAND, New York
Apr 22, 15
Vessel Inspection - Agency Action Complete
5108744
STATEN ISLAND, New York
Apr 21, 15
Vessel Inspection - Agency Action Complete
5109128
WASHINGTON, District of Columbia
Apr 21, 15
Incident Investigation - Agency Action Complete
5066953
STATEN ISLAND, New York
Feb 09, 15
Vessel Inspection - Agency Action Complete
1
0
System Subsystem Cause Construction/Loadline Hull
Description Due Date Resolved In conjunction with vessel's Annual COI inspection and ABS Loadline inspection, vessel shall make permanent repairs to 3ft radius inset on port bow, to include repair of the longitudinals 3 through 5, to the satisfaction of the marine surveyor. May 15, 15 Yes
Resolved Date Resolution Apr 22, 15 Visually inspected exterior of the repair job, ABS Surveyor inspected interior and witnessed the pressure test to 2 psi. all sat.
5068044
STATEN ISLAND, New York
Feb 04, 15
Vessel Inspection - Agency Action Complete
5064493
WASHINGTON, District of Columbia
Feb 03, 15
Incident Investigation - Agency Action Complete
4835450
STATEN ISLAND, New York
Apr 14, 14
Vessel Inspection - Agency Action Complete
1
0
System Subsystem Cause Electrical Electric Supply System (service)
Description Due Date Resolved Starboard side electrical motor winch power feed armored cable is compromised and exposed. Cable needs to be repaired back to original condition as per 46 CFR 111.105-17. May 02, 14 Yes
Resolved Date Resolution Apr 30, 14 Received report from General Marine Electric LLC attesting to the proper repairs to the electrical motor winch power feed cable located in the hazardous zone.
4652623
BATON ROUGE, Louisiana
Jul 11, 13
Vessel Inspection - Approved Inspection
4621716
PHILADELPHIA, Pennsylvania
Jun 14, 13
Vessel Inspection - Approved Inspection
1
0
System Subsystem Cause Deck/Cargo Vapor Control Systems
Description Due Date Resolved PROVE PROPER OPERATION OF HIGH AND OVERFILL ALARMS PRIOR TO USING VAPOR CONTROL SYSTEM. Jul 14, 13 Yes
Resolved Date Resolution Jul 11, 13
4612508
PHILADELPHIA, Pennsylvania
Jun 03, 13
Facility Transfer Monitor - Agency Action Complete
4554150
PHILADELPHIA, Pennsylvania
Mar 20, 13
Facility Transfer Monitor - Agency Action Complete
4319517
PHILADELPHIA, Pennsylvania
May 23, 12
Vessel Inspection - Approved Inspection
2
0
System Subsystem Cause Navigation Collision/Grounding Avoidance
Description Due Date Resolved Forward anchor light was not operational. Jun 06, 12 Yes
Resolved Date Resolution May 25, 12 Received evidence of proper operation of forward anchor light.
System Subsystem Cause Deck/Cargo Cargo Heating
Description Due Date Resolved Forward, #1 Thermal fluid heater was not operational. Volcanic tech was onboard attempting repairs. Required tech report after repairs are complete. Jun 06, 12 Yes
Resolved Date Resolution Jun 01, 12 Received tech report from Volcanic stating the thermal fluid heater was operational and all safety devices in working order.
3991530
New Orleans, Louisiana
Apr 27, 11
Vessel Inspection - Approved Inspection
3875060
Louisville, Kentucky
Oct 19, 10
Vessel Inspection - Agency Action Complete
3
0
System Subsystem Cause Navigation Collision/Grounding Avoidance
Description Due Date Resolved Due to the forward mast being removed during transit to New Orleans; while in transit on Inland Rivers a flashing amber light shall be placed on the bow in accordance with navigation rule 24, upon re-installation of forward mast prove proper placement and operation to the attending Class Surveyor or USCG inspector. Yes
Resolved Date Resolution Apr 27, 11 Vsl reinstalled forward mast. All lights on mast tested sat.
System Subsystem Cause Engineering Steam Boiler (auxiliary/waste heat)
Description Due Date Resolved Prove proper operation of # 1 Thermal Fluid Heater to the satisfaction of the attending Class Surveyor or USCG Inspector. Yes
Resolved Date Resolution Apr 16, 11 Cleared by attending ABS class surveyor
System Subsystem Cause Deck/Cargo Ballast
Description Due Date Resolved Prove proper operation of ballast pump to attending Class Surveyor or USCG Inspector. Yes
Resolved Date Resolution Apr 16, 11 Cleared by attending ABS surveyor.
Documents
Issued
Expires
Agency
Cargo Authority Attachment
April 12,2011
N/A
CERTIFICATE OF DOCUMENTATION
February 8,2022
February 28,2023
USCG
Certificate of Inspection
September 1,2021
September 1,2026
USCG
Certificate of Inspection - Amended
May 23,2016
May 23,2021
USCG
Classification Document
April 15,2011
September 14,2011
ABS
International Load Line Certificate
September 3,2021
April 14,2026
ABS
International Oil Pollution Prevention Certificate
May 23,2016
May 23,2021
SECNY
Int'l Oil Poll Prevention, Form B Supplement
September 3,2021
N/A
Tonnage Certificate, International
February 24,2011
ABS