IMO/VIN Callsign Flag Service Year
1147851 UNITED STATES Tank Barge 2003
Activity# Port Date Activity - Description Deficiencies
7367099 San Francisco, California Dec 13, 21 Vessel Inspection - Approved Inspection
  1
SystemSubsystemCause
06 - Cargo Operations Including EquipmentN/A - No SubsystemImproper/Lack of Maintenance
DescriptionDue DateResolved
Periodic inspection. Your vessel must undergo a periodic inspection within 3 months before or after the second or third anniversary of the date of your vessel's COI. The scope of the periodic inspection is the same as that for the inspection for certification as specified in 31.10-15(b). The inspection for certification shall include an inspection of machinery and equipment. Both prime movers were not in a condition to witness operational tests and shutdowns.Dec 13, 21Yes
Resolved DateResolution
Dec 20, 21Operational tests and shutdowns of prime movers inspected satisfactorily.
7346238 San Francisco, California Nov 06, 21 Vessel Inspection - Approved Inspection
7186321 San Francisco, California Aug 24, 21 Vessel Inspection - Approved Inspection
7096542 San Francisco, California Nov 16, 20 Vessel Inspection - Approved Inspection
  1
SystemSubsystemCause
13 - Propulsion and Auxiliary MachineryN/A - No SubsystemImproper/Lack of Maintenance
DescriptionDue DateResolved
All tank vessels are subject to the regulatoins in parts 50 to 63 of Subchapter F. Exhaust manifold heat shielding missing on port and stbd cargo pump engine. 31.30-1 56.95(b)Dec 17, 20Yes
Resolved DateResolution
Feb 26, 21Photos submitted 18 NOV 2020.
6890383 San Francisco, California Jan 17, 20 Vessel Inspection - Approved Inspection
6588608 San Francisco, California Nov 27, 18 Vessel Inspection - Approved Inspection
  3
SystemSubsystemCause
06 - Cargo Operations Including EquipmentN/A - No SubsystemImproper/Lack of Maintenance
DescriptionDue DateResolved
Cargo tanks in which Grade A, B, or C liquids are to be transported shall be fitted with either individual pessure-vacuum relief valves or shall be fitted with a venting system consisting of branch vent lines. Inboard P/V relief valve was seized on the vacuum side. Ensure proper operation of P/V relief valve.Nov 26, 18Yes
Resolved DateResolution
Nov 26, 18
SystemSubsystemCause
13 - Propulsion and Auxiliary MachineryN/A - No SubsystemImproper Installation
DescriptionDue DateResolved
Each ungrounded system must be provided with a suitably sensitive ground detection system located at the respective switchboard which provides continuous indication of circuit status to ground with a provision to momentarily remove the indicating device from the reference ground. The ground fault indicating lamps were burnt out.Dec 26, 18Yes
Resolved DateResolution
Dec 18, 18New bulbs were installed.
SystemSubsystemCause
13 - Propulsion and Auxiliary MachineryN/A - No SubsystemImproper Installation
DescriptionDue DateResolved
There must be ground detection for each power system that is isolated from the ship's service power by transformers. Vessel does not have ground detection at the transformer.Dec 26, 18Yes
Resolved DateResolution
Sep 24, 19Ground detection installed.
6567191 San Francisco, California Oct 24, 18 Vessel Inspection - Approved Inspection
6518282 San Francisco, California Aug 20, 18 Vessel Inspection - Approved Inspection
  1
SystemSubsystemCause
02 - Structural ConditionsN/A - No Subsystem
DescriptionDue DateResolved
Conduct permanent repairs to pinhole weld leak in #4P fwd, centerline blkhd during next drydock.Oct 31, 18Yes
Resolved DateResolution
Jan 16, 20Vessel representative provided maintenance evidence of repair completion.
6406103 WASHINGTON, District of Columbia Apr 15, 18 Incident Investigation - Agency Action Complete
6322490 San Francisco, California Nov 16, 17 Vessel Inspection - Approved Inspection
6030877 San Francisco, California Oct 26, 16 Vessel Inspection - Approved Inspection
5778325 San Francisco, California Dec 09, 15 Vessel Inspection - Approved Inspection
5039623 San Francisco, California Dec 15, 14 Vessel Inspection - Approved Inspection
4960817 San Francisco, California Aug 07, 14 Vessel Inspection - Approved Inspection
4727947 San Francisco, California Oct 02, 13 Vessel Inspection - Approved Inspection
4466407 San Francisco, California Oct 17, 12 Vessel Inspection - Approved Inspection
4335797 San Francisco, California Jun 06, 12 Vessel Transfer Monitor - Approved Inspection
4286076 San Francisco, California Apr 12, 12 Vessel Transfer Monitor - Approved Inspection
4267299 San Francisco, California Mar 19, 12 Enforcement - Agency Action Complete
4227353 San Francisco, California Jan 13, 12 Vessel Inspection - Approved Inspection
4214995 San Francisco, California Dec 27, 11 Vessel Inspection - Approved Inspection
  4
SystemSubsystemCause
Construction/LoadlineHull
DescriptionDue DateResolved
Make permanent repairs to the portside bow rake prior to cargo operations.Yes
Resolved DateResolution
Jan 12, 12Crop and renew hull plating IWO damage areas marked out by CG inspectors and ABS rep. Crop and renew all bottom longitudinals and deep web framing IWO of damaged areas marked out by CG inspectors and ABS rep. All repairs were made and 835 cleared.
SystemSubsystemCause
Construction/LoadlineHull
DescriptionDue DateResolved
Provide a repair plan for the damaged section of the portside bow rake.Yes
Resolved DateResolution
Jan 12, 12Received details from shipyard for repairs made.
SystemSubsystemCause
Deck/CargoHolds/Tanks
DescriptionDue DateResolved
Provide access to port wing tanks as necessary to survey the damage.Yes
Resolved DateResolution
Dec 29, 11The port # 1 wing tank was thoroughly inspected and no other damage was apparent.
SystemSubsystemCause
Deck/CargoCargo Transfer/Lightering (liquid)
DescriptionDue DateResolved
Vessel is granted a onetime cargo operation prior to making repairs, to offload any remaining cargo onboard.Yes
Resolved DateResolution
Jan 12, 12
4253652 WASHINGTON, District of Columbia Dec 26, 11 Incident Investigation - Agency Action Complete
4142932 San Francisco, California Sep 14, 11 Vessel Inspection - Approved Inspection
  2
SystemSubsystemCause
Deck/CargoCargo Stowage
DescriptionDue DateResolved
Issued CG-835: Identify source of cargo leaks found in the #4 double bottom, on the fwd bulkhead, and fractured weld next to ladder on cargo tank wall, IAW 46 CFR 31.10-21(c).Yes
Resolved DateResolution
Sep 17, 11ALOT of back gouging and re-welding on either side of suspected weld fractures. Pressed up wing voids (soap solution), air lance and finally dye penetrate. No leaks from any site. (ABS - class present during the whole evolution).
SystemSubsystemCause
Deck/CargoHolds/Tanks
DescriptionDue DateResolved
Issued CG-835: Make proper repairs to leaking hydraulic line from day tank (hose clamps).Oct 14, 11Yes
Resolved DateResolution
Sep 17, 11Replaced hose and clamps.
4017074 San Francisco, California May 17, 11 Vessel Inspection - Approved Inspection
4017189 WASHINGTON, District of Columbia May 11, 11 Incident Investigation - Agency Action Complete
4078318 San Francisco, California May 03, 11 Vessel Inspection - Approved Inspection
3960833 ALAMEDA, California Feb 18, 11 Vessel Inspection - Approved Inspection
3908498 San Francisco, California Dec 10, 10 Vessel Transfer Monitor - Agency Action Complete
3865339 San Francisco, California Oct 26, 10 Vessel Inspection - Approved Inspection
  1
SystemSubsystemCause
DocumentationCertificates/Documents
DescriptionDue DateResolved
Provide on board the stability letter dated 11 March 2004.Oct 26, 10Yes
Resolved DateResolution
Oct 26, 10
3680510 San Francisco, California Feb 10, 10 Vessel Transfer Monitor - Agency Action Complete
3684688 WASHINGTON, District of Columbia Jan 25, 10 Incident Investigation - Agency Action Complete
3612294 San Francisco, California Oct 13, 09 Vessel Inspection - Approved Inspection
  1
SystemSubsystemCause
EngineeringPressure Vessel
DescriptionDue DateResolved
Demonstrate successful hydrostatic test of pressure vessel (compressed air cylinder) located in the machinery room in accordance with 46CFR61.10-5(d).Nov 11, 09Yes
Resolved DateResolution
Nov 09, 09The owner/operator elected to remove the PV from the vessel and not replace it.
3355199 San Francisco, California Oct 31, 08 Enforcement - Payment Received
3350066 WASHINGTON, District of Columbia Oct 21, 08 Incident Investigation - Agency Action Complete
3338124 San Francisco, California Oct 14, 08 Vessel Inspection - Approved Inspection
3089322 San Francisco, California Oct 29, 07 Vessel Inspection - Approved Inspection
2815611 WASHINGTON, District of Columbia Nov 06, 06 Incident Investigation - Agency Action Complete
2776245 San Francisco, California Sep 12, 06 Vessel Inspection - Approved Inspection
2659053 San Francisco, California May 25, 06 Enforcement - Agency Action Complete
2648557 San Francisco, California May 13, 06 Vessel Inspection - Approved Inspection
  1
SystemSubsystemCause
Construction/LoadlineHull
DescriptionDue DateResolved
Make #5 starboard void available for inspection by a Coast Guard Marine Inspector prior to conducting cargo operations with the barge.May 31, 06Yes
Resolved DateResolution
May 19, 06
2650084 WASHINGTON, District of Columbia May 13, 06 Incident Investigation - Agency Action Complete
2563407 San Francisco, California Jan 11, 06 Vessel Inspection - Approved Inspection
  2
SystemSubsystemCause
Fire FightingSemiportable Chemical-Foam Fire Extinguishers
DescriptionDue DateResolved
Provide one B-V semi-portable extinguisher in the cargo area IAW 46 CFR Table 34.10(a). This requirement must be completed prior to transiting with persons onboard.Feb 11, 06Yes
Resolved DateResolution
May 19, 06
SystemSubsystemCause
LifesavingLifefloat
DescriptionDue DateResolved
Provide one six person life float IAW Title 46 Subchapter W and local policy. This requirement must be completed prior to transiting with persons onboard.Feb 11, 06Yes
Resolved DateResolution
May 19, 06
2318764 San Francisco, California Apr 21, 05 Vessel Inspection - Approved Inspection
2318756 San Francisco, California Apr 21, 05 Vessel Inspection - Approved Inspection
2336717 WASHINGTON, District of Columbia Apr 18, 05 Incident Investigation - Agency Action Complete
2314888 San Francisco, California Mar 18, 05 Vessel Inspection - Approved Inspection
  12
SystemSubsystemCause
Deck/CargoCargo Transfer/Lightering (liquid)
DescriptionDue DateResolved
Clean flame screens on vent on common vapor header.Apr 21, 05Yes
Resolved DateResolution
Mar 21, 05Operator corrected on the spot.
SystemSubsystemCause
ElectricalElectrical Distribution System (service)
DescriptionDue DateResolved
Properly blank off the unused circuit breaker (#6) on the main panel in cargo pump engine shack.Apr 21, 05Yes
Resolved DateResolution
Apr 21, 05
SystemSubsystemCause
EngineeringCompressed Air System (control)
DescriptionDue DateResolved
Properly secure air receiver in cargo pump engine shack.Apr 21, 05Yes
Resolved DateResolution
Apr 01, 05Removed requirement and issued a different requirement on 01APR05 that required the operator to remove the air receiver completely.
SystemSubsystemCause
Deck/CargoCargo Stowage
DescriptionDue DateResolved
Properly secure drum on stern. Must be completed prior to getting underway with persons onboard.Apr 21, 05Yes
Resolved DateResolution
Mar 21, 05Operator provided written attestation.
SystemSubsystemCause
Deck/CargoCargo Transfer/Lightering (liquid)
DescriptionDue DateResolved
Properly secure fuel piping on starboard cargo pump engine.Apr 21, 05Yes
Resolved DateResolution
Apr 21, 05
SystemSubsystemCause
EngineeringDiesel Engine (auxiliary)
DescriptionDue DateResolved
Prove proper operation of emergency fuel shut-off valve for the starboard cargo pump engine.Apr 21, 05Yes
Resolved DateResolution
Mar 21, 05Operator corrected on the spot.
SystemSubsystemCause
LifesavingLifejacket/PFD (Type I)
DescriptionDue DateResolved
Provide 2 Type-I lifejackets IAW 46CFR199.620. Must be completed prior to getting underway with persons onboard.Apr 21, 05Yes
Resolved DateResolution
Mar 21, 05Operator provide receipt and written attestation.
SystemSubsystemCause
Deck/CargoCargo Transfer/Lightering (liquid)
DescriptionDue DateResolved
Provide proof of annual calibration of all pressure gauges on cargo lines and pumps IAW 46CFR35.35-70.Apr 21, 05Yes
Resolved DateResolution
Apr 21, 05
SystemSubsystemCause
EngineeringCompressed Air System (control)
DescriptionDue DateResolved
Remove the Husky 5 HP 26 gallon vertical compressor from the tank barge. The barge is restricted from operating the compressor at any time until removal from the barge. All air pressure shall be relieved from the pressure vessel and its electrical source properly disconnected. Cite: 46 CFR 54.01-5(c)(4)May 01, 05Yes
Resolved DateResolution
Apr 21, 05
SystemSubsystemCause
LifesavingLifebuoys
DescriptionDue DateResolved
Renew batteries in waterlight.Apr 21, 05Yes
Resolved DateResolution
Mar 21, 05Operator corrected on the spot.
SystemSubsystemCause
LifesavingLifebuoys
DescriptionDue DateResolved
Stencil name of vessel and port on lifebuoy.Apr 21, 05Yes
Resolved DateResolution
Mar 21, 05Operator corrected on the spot.
SystemSubsystemCause
Operations/ManagementCargo Transfer/Lightering
DescriptionDue DateResolved
Vessel is permitted to offload all cargo at a port within the confines of San Francisco Bay and its tributaries at the first available opportunity. Following offload, vessel is restricted from conducting any cargo operations until a satisfactory COI inspection is completed.Yes
Resolved DateResolution
Apr 21, 05Conducted a satisfactory COI inspection.
2307300 San Francisco, California Mar 10, 05 Enforcement - Agency Action Complete
2307220 WASHINGTON, District of Columbia Jan 12, 05 Incident Investigation - Agency Action Complete
2167520 San Francisco, California Aug 05, 04 Facility Transfer Monitor - Approved Inspection
2039540 San Francisco, California Apr 07, 04 Vessel Inspection - Approved Inspection
1983259 WASHINGTON, District of Columbia Jan 12, 04 Incident Investigation - Agency Action Complete
1975447 Washington, District of Columbia Dec 31, 03 Vessel Inspection - ASP Criteria Met
1942133 San Francisco, California Oct 31, 03 Vessel Inspection - Approved Inspection
1929009 Warrenton, Oregon Oct 24, 03 Vessel Inspection - Agency Action Complete
  2
SystemSubsystemCause
Operations/ManagementPollutionUnknown
DescriptionDue DateResolved
Provide valid Vessel Response Plan and Shipboard Oil Pollution Emergency Plan. This item is to be completed prior to loading of cargo. LEGACY COMPONENT DESC: Vessel Response PlanNov 15, 03Yes
Resolved DateResolution
Oct 29, 03
SystemSubsystemCause
Deck/CargoHolds/TanksImproper Installation
DescriptionDue DateResolved
Repair and demonstrate operation of High Level and Overfill alarms. This item is to be completed prior to loading of cargo LEGACY COMPONENT DESC: Tank Level Monitoring DeviceNov 15, 03Yes
Resolved DateResolution
Oct 31, 03Alarms tested sat.
Documents Issued Expires Agency
Cargo Authority Attachment October 23,2003 N/A
CERTIFICATE OF DOCUMENTATION December 3,2021 January 31,2023 USCG
Certificate of Inspection March 21,2005 October 24,2008 N/A
Certificate of Inspection - Amended March 21,2005 October 24,2008 N/A
Classification Document October 23,2008 October 23,2013 ABS
International Load Line Certificate October 23,2008 October 23,2013 ABS
International Oil Pollution Prevention Certificate October 24,2003 October 24,2008 N/A
Stability Letter March 11,2004 N/A