IMO/VIN
Callsign
Flag
Service
Year
1267671
WDI7481
UNITED STATES
Tank Barge
2016
Activity#
Port
Date
Activity - Description
Deficiencies
7659266
Baltimore, Maryland
Mar 29, 23
Vessel Inspection - Approved Inspection
7397126
Wilmington, North Carolina
Feb 16, 22
Vessel Inspection - Approved Inspection
7383509
Baltimore, Maryland
Jan 11, 22
Vessel Inspection - Approved Inspection
7117380
ST PETERSBURG, Florida
Dec 29, 20
Vessel Inspection - Approved Inspection
7117380
Tampa, Florida
Dec 29, 20
Vessel Inspection - Approved Inspection
6949346
New Orleans, Louisiana
May 14, 20
Vessel Inspection - Approved Inspection
6853839
ST PETERSBURG, Florida
Nov 12, 19
Vessel Inspection - Approved Inspection
6853839
Tampa, Florida
Nov 12, 19
Vessel Inspection - Approved Inspection
6618682
ST PETERSBURG, Florida
Feb 01, 19
Vessel Inspection - Approved Inspection
6618682
Tampa, Florida
Feb 01, 19
Vessel Inspection - Approved Inspection
6420136
New Orleans, Louisiana
May 19, 18
Vessel Inspection - Approved Inspection
6410953
Wilmington, North Carolina
May 10, 18
Vessel Inspection - Approved Inspection
1
0
System Subsystem Cause Engineering Lubricating Oil Service System
Description Due Date Resolved Nonmetallic flexible hose in lube oil systems must be in accordance with SAE J1942. The three cargo pump engines have non-approved hoses on the "Puradyn" oil centrifuge; replace the hoses in question with an approved type hose. May 24, 18 Yes
Resolved Date Resolution May 18, 18 Vessel Rep sent photos of the repared hose to Sector New Orleans. Cleared Outstanding 835
6359814
CORPUS CHRISTI, Texas
Feb 23, 18
Vessel Inspection - Approved Inspection
6136558
New Orleans, Louisiana
May 01, 17
Vessel Inspection - Approved Inspection
5940773
STURGEON BAY, Wisconsin
Jul 01, 16
Vessel Inspection - Approved Inspection
5056681
STURGEON BAY, Wisconsin
May 21, 14
Vessel Inspection - Approved Inspection
11
0
System Subsystem Cause Engineering Diesel Engine (auxiliary) Improper Installation
Description Due Date Resolved Flexible fuel hoses are marked SAE J1527, not SAE J1942 per Sub F for the 2 large Gensets, & 3 cargo pump engines. Jun 16, 16 Yes
Resolved Date Resolution May 19, 16 Cleared 835 requirement after obtaining a copy of J1942 from MSC. All SAT.
System Subsystem Cause Pollution Prevention/Response Prevention Equipment
Description Due Date Resolved Install plugs on the drain hole for the coamings around the stern fuel filling valve & teh black oily waste tank coaming. May 31, 16 Yes
Resolved Date Resolution May 18, 16 Plugs were installed.
System Subsystem Cause Electrical Electrical Distribution System (service)
Description Due Date Resolved Label all motor controllors and disconnect switches to their respective equipment. Jun 16, 16 Yes
Resolved Date Resolution May 18, 16 Electrical controllors & knife switches were marked.
System Subsystem Cause Lifesaving Lifebuoys Improper Installation
Description Due Date Resolved Properly attach the waterlight to the ring buoy and install the correct batteries in the waterlight. May 31, 16 Yes
Resolved Date Resolution May 18, 16 Waterlight & throw bag were attached.
System Subsystem Cause Pollution Prevention/Response Response Equipment
Description Due Date Resolved Provide a pollution spill kit onboard the vessel. May 31, 16 Yes
Resolved Date Resolution Jun 01, 16 Pollution spill kit was verified
System Subsystem Cause Documentation Certificates/Documents
Description Due Date Resolved Provide a valid COD. May 31, 16 Yes
Resolved Date Resolution May 18, 16 Vsl rep provided a copy of the COD, placed into vsl's documents.
System Subsystem Cause Documentation Certificates/Documents
Description Due Date Resolved Provide a valid COFR. May 31, 16 Yes
Resolved Date Resolution May 25, 16 A valid COFR has been issued.
System Subsystem Cause Engineering Fuel Oil Service System Improper Installation
Description Due Date Resolved Provide chafing gear on fuel return line for the in port/house genset, & secure the oil drain line from dangling inside the bilge of the genset. Jun 16, 16 Yes
Resolved Date Resolution May 18, 16 Fuel hose & oil drain line were secured.
System Subsystem Cause Electrical Electrical Distribution System (service)
Description Due Date Resolved Provide rubber matting in front & behind the main switchboard & the winch switchgear in the generator house. Jun 16, 16 Yes
Resolved Date Resolution May 18, 16 Matting installed, all Sat.
System Subsystem Cause Fire Fighting Fixed Fire Detection System Invalid
Description Due Date Resolved Vsl to provide MSC approval for the fire detection system. Yes
Resolved Date Resolution May 24, 16 Received MSC approval letter E2-1601947 for fire detection system
System Subsystem Cause Operations/Management Cargo Transfer/Lightering Invalid
Description Due Date Resolved Vsl's cargo loading/stability software system is under reivew with ABS; vsl to provide ABS approval for software system prior to use. Yes
Resolved Date Resolution Jun 01, 16 Rcvd a copy of the ABS approval letter, dated 26May16 for the "CargoMax" loading software
Documents
Issued
Expires
Agency
Cargo Authority Attachment
December 21,2017
N/A
CERTIFICATE OF DOCUMENTATION
December 8,2022
January 31,2024
USCG
Certificate of Inspection
May 16,2016
May 16,2021
USCG
Certificate of Inspection - Amended
May 16,2016
May 16,2021
N/A
Classification Document
May 16,2016
October 15,2016
ABS
International Certificate of Fitness - Chemical
May 16,2016
May 16,2021
N/A
International Load Line Certificate
May 16,2016
October 15,2016
ABS
International Oil Pollution Prevention Certificate
May 16,2016
October 15,2016
ABS
Int'l Oil Poll Prevention, Form B Supplement
March 4,2019
March 4,2024
N/A
Stability Letter
April 21,2016
ABS
Tonnage Certificate, International
May 13,2016
ABS
Tonnage Certificate, U.S.
May 13,2016
ABS