Ridgebury Captain Drogin
Print Q88   
IMO/VIN Callsign Flag Service Year
9320714 V7FF4 MARSHALL ISLANDS Tank Ship 2007
Activity# Port Date Activity - Description Deficiencies
6350624 Morgan City, Louisiana Feb 08, 18 Vessel Inspection - Approved Inspection
  1
SystemSubsystemCause
Deck/CargoInert Gas SystemPlaced in Improper Service
DescriptionDue DateResolved
The Inert Gas system shall be capable of inerting, purging and gas freeing empty tanks and maintaining atmosphere in cargo tanks with required oxygen content. PSCO was informed by crew that oxygen analyzer is not operable.Feb 10, 18Yes
Resolved DateResolution
Feb 10, 18Attended vessel and completed IGS testing after receiving a Class survey attesting to the proper installation of the O2 sensor.
5856732 New Orleans, Louisiana Apr 25, 16 Vessel Inspection - Approved Inspection
  3
SystemSubsystemCause
DocumentationMarkings/Placards
DescriptionDue DateResolved
1099 - The tank overfill alarm required by paragraph (a) of this section must be identified with the legend "TANK OVERFILL ALARM" in black letters at least 2 inches on a white background. PSCO observed that the vessel's overfill alarm tower that was located forward and starboard of the manifold had a weathered legend that was not legible from the aft end of the tower. 46 CFR 39.2007(d). 16c.May 09, 16Yes
Resolved DateResolution
Apr 26, 1626APR2016: Received class report from DNV-GL stating that the deficiency has been rectified. The class report stated (and showed with photographic evidence) that the signed had been properly repainted.
SystemSubsystemCause
Deck/CargoCargo Transfer/Lightering (liquid)
DescriptionDue DateResolved
1820 - Means shall be provided to control leaks of flammable liquids. PSCO observed on the lower bearing region of both the #1 and #3 cargo pumps some cargo residue that had leaked during a previous discharge operation. Prior to operation of #1 and #3 cargo pumps to the satisfaction of Recognized Organization. SOLAS 74 a (14) II-1/4.1.1. Prior to operation of #1 and #3 cargo pumps.Apr 25, 16Yes
Resolved DateResolution
Apr 26, 1626APR2016: Received class report from DNV-GL stating that the deficiency had been rectified. The class report stated that the mechanical seals were tightened on #1 & #3 cargo pumps, a function test was carried out and there were no signs of leakage.
SystemSubsystemCause
Deck/CargoInert Gas System
DescriptionDue DateResolved
1870 - Special consideration shall be given to the design and location of scrubber and blowers with relevant piping and fittings in order to prevent flue gas leakages into enclosed spaces. PSCO observed that the rubber coupling on the outtake side of the #2 IG blower was cracked around the entire circumference of the coupling. SOLAS 74 a (14) II-1/4.5.5.3.2, FSS Code 15.2.3.1.2.1. 16a.May 09, 16Yes
Resolved DateResolution
Apr 26, 1626APR2016: Received class report from DNV-GL stating the deficiency had been rectified. The class report stated that the cracked rubber coupling was removed and replaced by a new rubber coupling.
5082471 TEXAS CITY, Texas Mar 27, 15 Vessel Inspection - Approved Inspection
4849912 PHILADELPHIA, Pennsylvania May 04, 14 Vessel Inspection - Approved Inspection
4809897 TEXAS CITY, Texas Mar 13, 14 Vessel Inspection - Approved Inspection
4243814 Houston, Texas Feb 13, 12 Vessel Inspection - Approved Inspection
3963934 TEXAS CITY, Texas Mar 18, 11 Vessel Inspection - Approved Inspection
3630162 SOUTH PORTLAND, Maine Nov 09, 09 Vessel Inspection - Agency Action Complete
3246937 San Pedro, California Jun 25, 08 Vessel Inspection - Agency Action Complete
3247237 San Pedro, California Jun 24, 08 Boarding - Agency Action Complete
3243665 San Pedro, California Jun 21, 08 Vessel Operational Control - Agency Action Complete
Documents Issued Expires Agency
Certificate of Compliance - Tank Vessel March 18,2011 March 18,2013 N/A
Classification Document July 18,2017 July 2,2022 DNV GL
COC-TVE Annual February 20,2012 March 18,2013 N/A
COC-TVE Renewal March 18,2011 March 18,2013 N/A
International Load Line Certificate May 17,2017 July 2,2022 DNV GL
International Oil Pollution Prevention Certificate May 17,2017 July 2,2022 DNV GL
ISM - Document Of Compliance October 19,2017 March 19,2018 DNV GL
ISM - Safety Management Certificate April 8,2014 October 8,2014 DNV
Minimum Safe Manning Document April 8,2014 MH
SOLAS Cargo Ship Safety Construction Certificate May 17,2017 July 2,2022 DNV GL
SOLAS Cargo Ship Safety Equipment Certificate May 17,2017 July 2,2022 DNV GL
SOLAS Cargo Ship Safety Radio Certificate May 17,2017 July 2,2022 DNV GL
Tonnage Certificate, International June 4,2014 DNV GL